Historical
Project
Municipal offices
Status
Proposal completed
Date
10.2023
The subject of the solution was the main building of the kindergarten and the municipal office, the change of which was related to the change in energy efficiency of its use and to the improvement of the standards of both existing facilities, as well as the possibility of using the attic, which is currently not utilized. Marginally, the solution also addressed the secondary economic building on the western part of the plot, which needed to be adapted to the proposed changes related to the design of the heat pump. The architectural solution of both buildings can be characterized as minimalist, appropriately applying new interventions related to sustainable construction methods in an effort to preserve its historical character.
Project
Fortification system in Trnava (2.st phase)
Status
Proposal completed
Date
12.2022
The subject of the second stage, "Preliminary Project Preparation for the Comprehensive Renovation of the City Fortifications in Trnava" (2022), is the update of previously developed conceptual materials (including Stage 1) and the establishment of binding regulations for the city fortifications and their adjacent areas. This is to ensure a consistent presentation of all potential parts of the city fortifications in a unified methodical and architectural manner. Simultaneously, it aims to enable the full utilization of the city fortifications and their surrounding areas as an attractive element of the urban monument reserve and the entire settlement. In addition to regulations and proposals for the renovation of the entire city fortifications, the material also included a proposal for the location of Horný Mlyn with an adjacent moat on Rybníková Street, visualizations of selected resolved parts, and objects of the city fortifications.
Project
Fortification system in Trnava (1.st phase)
Status
Proposal completed
Date
12.2021
Pre-project preparation for the restoration of the city fortification system in Trnava.
This is a multi-stage project, processed as a pilot project of the UNESCO Department for the Restoration of Architectural Heritage. The 1st stage of the project followed up on the already processed conceptual materials and at the same time specified the idea of completing the remaining unrestored parts of the fortification so that they continue in a single line of restoration from a methodological as well as an architectural point of view. The conceptual material variably solves the architectural designs of individual buildings in the sense of more intensive use of the potential of the unique fortification, demarcating the historical core from the rest of the city.